This case study shows how EV’s Optis Infinity camera technology and LeakVA visual analytics service assisted an operator to restore production to their gas well by locating and evaluating a downhole leak.
During the platform’s maintenance shutdown period, the operator observed a significant increase in A-Annulus pressure, prompting the operator to defer production until the root cause of the pressure build up could be identified.
LeakVA
EV’s visual diagnostics solutions overcome the limitations of alternative primary barrier leak detection technologies by providing a detailed 360-degree evaluation of the wellbore. High-definition colour video can quickly identify the location of a leak and quantitatively evaluate its severity. Armed with this information, an Operator can then determine the correct course of action to be taken – immediately at the well site.